Files
nix-config/agents/evals/review-comments-and-docs/fixtures/F02-stability-notes.md
T
ryan4yin | 二花 f32d67a5cc feat(agents): add review-comments-and-docs and two evaluation suites (#434)
Adds the review-comments-and-docs skill (1282-word body) and two evaluation suites: a 21-case
measured suite for the skill, and a harness that runs the two concurrency scenarios previously left
unrun in agents/evals/global-rules.md.
2026-10-12 00:35:06 +08:00

862 B

Voltage stability notes — render-node-03

Everything below is inference from board behavior; nothing has been stress-tested on this board, so treat the whole table as provisional.

Setpoint Result Basis
Auto baseline vendor default
1.15 V froze after about 20 m 2026-09-13 y-cruncher run
1.17 V passed a 6 h soak 2026-09-14 y-cruncher run

Dated notes

  • 2026-09-13: y-cruncher at 1.15 V. The log ends when the machine froze; no WHEA events were recorded before the freeze.
  • 2026-09-14: 6 h soak at 1.17 V completed with no WHEA events.

Conclusion

Since nothing was actually tested, the table is a set of inferences; the 1.17 V pass is the only reason to keep that setpoint.